Free practice lesson · No account needed
Review a document before sending or filing it
Compare an outgoing packet with approved instructions, decide whether to release or hold it, and explain what needs to happen next.
Go to the practice packetHow to review an outgoing packet
- Confirm the release instructions. Match the matter ID and name to the approved instructions. Verify the exact recipient or filing destination, the approved contents, and who must sign off.
- Open every outgoing file. Inspect the exact PDFs attached or queued for release. Compare them with the approved versions. Check signatures, page count and order, legibility, and every required exhibit.
- Check for internal or sensitive material. Look for draft markings, comments, internal notes, and sensitive material. Ask your supervisor about anything you are unsure is approved for release.
- Hold, escalate, and recheck. If anything differs or approval is missing, hold the packet and tell the supervisor what needs to be resolved. Reopen the corrected files, recheck the destination and contents, and confirm recorded sign-off before release.
Practice with the Harbor Studio packet
You are checking fictional matter M-104 · Harbor Studio. Open the files below. On paper or in a local note, list the five issues and write what you would tell your supervisor. Keep the exercise offline and use only the fictional files.
Approved instructions
- Destination is reviewer@example.com.
- Include the signed cover letter and both Exhibit A pages.
- Leave internal notes out of the packet.
- Record final approval before release.
Prepared packet
Draft destination is reviewers@example.com. Final approval is not recorded.
Check your work
Reveal the five-issue answer key
Decision: Hold the packet.
- Wrong destination. The draft says reviewers@example.com. The approved address is reviewer@example.com.
- Unsigned draft cover letter. The folder contains Cover_Letter_Draft.pdf with a blank signature line. Obtain the signed, approved version.
- Incomplete exhibit. Exhibit_A.pdf has one page labeled 1 of 2. Obtain both approved pages and check their order.
- Internal notes included. Internal_Notes.pdf is outside the approved contents. Remove it from the outgoing packet and keep it in the appropriate internal location.
- Final approval missing. The required final sign-off has not been recorded. Keep the packet on hold until a supervisor records approval of the corrected packet.
Model hold note
“Holding M-104 Harbor Studio. The draft recipient differs from the approved address, the cover letter is an unsigned draft, Exhibit A is missing page 2, and internal notes are attached. Final sign-off is missing. Please confirm the intended address, provide the signed letter and complete exhibit, and approve the corrected packet after the notes are removed. I’ll recheck the exact files and destination before any release.”
Supervisor check
Ask the learner to show all five discrepancies in the instructions and the actual files. Have them explain whom they would notify and what they would recheck after corrections. Verify they reopen each corrected outgoing file, confirm the destination and recorded approval, and keep the packet on hold if anything remains unresolved.
Fictional training materials for supervised practice. This exercise is not legal advice.

